Temperature system operation: The user switching panel to the electric furnace is sent to the electric furnace. At this time, the program is charged, and the instrument (such as P, I, D parameters) is set according to the temperature instrument manual. Arrive 6kW.Large -molding gear axis real vacuum carbonate quenching The program setting temperature must not be higher than the temperature furnace parameter temperature. When the electric furnace works, the furnace door shall not be opened. When taking the product, you should wait until the furnace temperature is below 100 ° C. When the heating is heated, the heating power must not exceed 6kW, otherwise the damage will be heated.Carbide-tipped Gear Hob Vacuum Brazing Tight -stroke hoop screw bolt. Then pass through the process atmosphere, until the oxygen content in the furnace tube meets the process requirements. After the product sintering process is completed, it should continue to pass the small amount of process atmosphere and cool down. Until the temperature in the furnace is lower than the process requirements, the stove -tube sealing end can be opened to pick up the product.HIGH-SPEED ACCURACY BENCH DRILLING MACHINE Ensure the length of the constant temperature zone and ensure that the furnace is used for 24 hours*30 days. The heating element is a silicon carbon rod. Within 3 hours, the temperature accuracy in the furnace is 3 degrees.B1 SERIES DRILLING MACHINE
top of page
bottom of page
ty